NEA slashes load-shedding hours to 48 hrs a week
The Nepal Electricity Authority (NEA) has slashed the load-shedding to 48 hours a week effective from Friday from the previous 56 hours a week.
The NEA reduced the load-shedding hours after it was able to control leakages of electricity in some areas and also because of increase in water-level in the rivers. nepalnews.com
|