Thursday Mar 28, 2024
Thursday Mar 28, 2024

NPC directs feasibility study for tunnel construction in Myagdi


Nepalnews
RSS
2022 Mar 02, 8:35, Myagdi
Representative photo

The National Planning Commission (NPC) has directed the authorities concerned to undertake a feasibility study on tunnel construction on Myagdi section of the Beni-Jomsom road.

NPC Vice-chairperson Dr Bishwo Poudel, who arrived at the location for monitoring the North-South Kaligandaki Corridor and Beni-Jomsom-Korala road project, directed to carry out a study on tunnel construction in Myagdi and blacktop the road in Mustang.

Project Chief Jagat Prajapati shared that the vice-chairperson-led monitoring team had directed to carry out feasibility study for tunnel construction in two places along the Myagdi section (having landslide vulnerability, weak topography and rocky mountain) and blacktop the road constructed in upper Mustang.

"Dr Poudel directed to initiate a study on the construction of a tunnel way along the Bhirkot and Rupse section as an alternative road", project chief Prajapati said, adding that he also directed to advance the plan of blacktopping graveled road along the Jomsom-Korala section.

Vice-chair Dr Poudel said alternative should be explored to construct a tunnel way so as to make the road sustainable and secured. He laid emphasis on exploring alternative road to ease trade through Korala checkpoint and also for religious and tourism promotion focusing historical monasteries.

The Vice-chair also stressed the need to put top priority on the construction of a road linking Mustang and Dolpa.

Project Chief Prajapati said the project has already undertaken a preliminary study for the construction of a 350-meter-long tunnel.

The Kaligandaki Corridor Road – the shortest route in Nepal to connect India and China is a national pride project.

There are problems of river erosion, flood and landslide on Myagdi section of Beni-Jomsom road of which construction was initiated in 2017. Up-gradation has been completed in six out of 13 sections of 186-km Beni-Jomsom-Korala road.

READ ALSO:

National Planning Commission NPC feasibility study Tunnel construction Myagdi Beni-Jomsom road Kaligandaki Corridor Mustang national pride project road construction
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

KMC-02, UttarDhoka,
Lazimpat, Nepal

Newsroom
+977–01–4445751 / 4445754

E-mail
[email protected] [email protected]

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal