Thursday Apr 25, 2024
Thursday Apr 25, 2024

Beni-Jomsom

Beni-Jomsom Road to close for 6 hours

Apr 18, 2023
Chief District Officer Tulsiram Poudel said the vehicular movement has been halted from 6.00- 9.00 am and 1.00-3.00 pm from April 17 through May 3.

Landslips obstruct Beni-Jomsom road

Aug 22, 2022
Repair on the road with the mobilization of the project workers is underway

DPR prepared to control landslides in Myagdi

Aug 13, 2022
Detailed Project Report to control landslides.

Flood and landslide destroying beauty of Rupse waterfall

Aug 2, 2022
Flood and landslide destroying beauty of Rupse waterfall

'Timecard' removed on Beni-Jomsom road

Apr 1, 2022
The road was being upgraded at various places from Beni to Letang of Mustang by stopping the movement of vehicles for six hours daily since January 25.

Temperature of the upper Mustang reaches -15 degrees

Feb 5, 2022
Transportation in rural areas of Mustang and Myagdi has been disrupted due to snowfall.

Public transportation resumes, roads still blocked in Myagdi

Jul 20, 2021
With the lockdown eased in the wake of declined cases of coronavirus in Myagdi district, the local administration decided to resume public transportation.
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

KMC-02, UttarDhoka,
Lazimpat, Nepal

Newsroom
+977–01–4445751 / 4445754

E-mail
[email protected] [email protected]

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal